CSC/HIP CMS dCache and NDGF alice dCache Networking - 100 Gbits/s aka 12GB/s connection - It maxed out so funet people upgraded trunk to 400Gbits/s for other services to work also - watching the traffic and optimizing with migration move commands -> fast cache/hot files? Hardware HIP CMS dCache 2 hypervisors PowerEdge R6515 hosting virtual machines 8 PowerEdge R740xd2 NDGF alice pools 5 PowerEdge R740xd2 - Two Dell PowerEdge R6515 15th generation hypervisors are used as a platform for dCache headnodes and other virtual machines. Hypervisors have two 2TB SSDs configured as raid 1 mirror. - Dell PowerEdge R740xd2 14th generation servers with 220 GB SSD and 26 20TB spinning discs and PERC H740P mini monolithic RAID controllers are configured as 24 disk + 2 spare RAID6 storage and used as dCache pools. - Hardware moving to another room, downtime - There is funding for new storage hardware, i've heard Software - HIP CMS dCache has some VMs rhel 10 - RHEL 10 has quantum safe crypto or similar -> CA files?